EARLY PRODUCTION FACILITIES

The objective of achieving accelerated field production to better evaluate the true well and production characteristics whilst significantly improving cash flow is not new. The benefits of early production facilities are:

  • Reservoir characterization
  • Early cash flow for the operator
  • Low cost field development
  • Rapidly deployed
  • Reusable stock facilities
  • Flexible, modular equipment
  • Broad operating range
  • Reduced hook-up/commissioning
  • Engineered, safe, fit for purpose, and available on a fast-track basis
  • Can be implemented where existing infrastructure is limited or for marginal fields
  • Commercially attractive at varying energy prices
  • Available on a LOM basis, or Lease to Purchase or EPC basis
THE INFLUIT DIFFERENCE

Influit can provide the complete turnkey project service, working closely with our clients at the bidding stage through to project implementation, installation and commissioning.

Typically the lead time for a 25-40k bopd facility can be as short as 18 weeks new build from contract award to ex-works.

Influit has an enviable track record in the project management and technical specification of early production facilities and the successful estimation of both capital costs and the amortisiation of these costs into a winning lease, operate and maintenance (LOM) rate.

The facilities are designed in modular packages that allow the easy addition of extra processing like produced water treatment and gas conditioning c/w compression.

Contact us to find out more about the benefits of working with Influit.